Historic Lanesboro Dam

The Lanesboro Stone Dam is a community treasure with an environmental and tourist impact that stretches beyond Lanesboro to the entire Bluff Country region.

  • The Lanesboro Stone Dam was built in 1868.
  • It is one of only six gravity arch dams left in the United States
  • The dam was recated by immigrant craftsman using unmortared limestone blocks.  It is included on the National Registry of Historic Places and is registered with Minnesota's State Historical Preservation Office.
  • Only 3% of the nearly 80,000 dams in the U.S. generate electricity.  Lanesboro is fortunate to be one of those dams.
  • During the 2017 Special Legislative Session, the legislature granted the City of Lanesboro $4 million dollars for the repair of the Historic Lanesboro Stone Dam.

         

Lanesboro Dam Repair

Lanesboro Dam

BID DEADLINE:     April 25, 2019, 2:00 p.m., Local Time

NOTICE

Sealed bids for the above project will be received by Michele R. Peterson, City Administrator/Clerk, at the City of Lanesboro, 202 Parkway Avenue South, Lanesboro, MN 55949 until the Bid Deadline.  Immediately thereafter, the bids will be publicly opened and read aloud.

In general, the project consists of repairs to the Lanesboro Dam:  Reconstructing right abutment wall; constructing new walls and slab at power canal intake; constructing cellular sheet pile dams across upstream face of spillway; removing and reconstructing gate structure, including furnishing and installing new electric operated slide gates; lowering power canal overflow spillway and reconstructing riprap overflow spillway; constructing new stormwater outfall; furnishing and installing a temporary sheet pile cut off wall at Duschee Creek;, and replacing the bass pond pipe.

A pre-bid meeting to examine the project site will be held on April 9, 2019, at 10:00 a.m.  Meet at City Hall, 202 Parkway Avenue South, Lanesboro, MN 55949, for a project introduction, followed by a project site walkthrough.

A single prime bid will be received for the work.

BID SECURITY

Bids must be accompanied by bid security in the amount of 5% of the maximum bid amount.  Bid and bid security may not be withdrawn for a period of 45 days after the Bid Deadline.

Bid security will be retained if the Bidder is awarded the Work and fails to execute the Agreement and furnish 100% Performance and Payment Bonds.

PROJECT FUNDING

This project is made possible in part by a grant provided by the Minnesota Department of Natural Resources, through and appropriation by the Minnesota State Legislature.  The project will be subject to requirements contained in applicable state regulations, including those for prevailing wage rates issued by the Minnesota Department of Labor and Industry.

QUALIFICATIONS

Bidders shall submit a Statement of Bidder's Qualifications with their bid. 

The successful bidder must be a “responsible contractor.” The term “responsible contractor” means a contractor as defined in Minnesota Statutes, section 16C.285, subdivision 3. Any prime contractor, subcontractor, or motor carrier that does not meet the minimum criteria or fails to comply with the verification requirements is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. A prime contractor, subcontractor, or motor carrier that makes a false statement under oath verifying compliance with the minimum criteria will be ineligible to be awarded a construction contract on the project, and the submission of a false statement may result in termination of a contract awarded to a prime contractor, subcontractor, or motor carrier that submits the false statement. A prime contractor shall include in its verification of compliance a list of all of its first-tier subcontractors that it intends to retain for work on the project. Before execution of a construction contract, a prime contractor shall submit a supplemental verification under oath confirming that all subcontractors and motor carriers that the prime contractor intends to use to perform project work have verified to the prime contractor, through a signed statement under oath by an owner or officer, that they meet the minimum criteria for a responsible contractor.

RIGHTS RESERVED

Owner reserves the right to reject any or all bids and to waive informalities in any bid.

BIDDING DOCUMENTS

Bidding documents may be examined at Builders Exchanges in Eau Claire, La Crosse, Minneapolis, and Rochester. 

Bidding documents may be obtained in PDF electronic format by download from the Quest Construction Data Network website, accessible via www.AyresAssociates.com by clicking on the "Bidding" link, for a non-refundable fee of $30.00. 

Published by authority of:   City of Lanesboro

 
 